COLLECTIONS

JAR Transitional

Home > Kitchen Collections > JAR Transitional
Gallery Image 1
Gallery Image 2
Gallery Image 3
Gallery Image 4
Gallery Image 5
Gallery Image 6
Gallery Image 7
Gallery Image 8
Gallery Image 9
Gallery Image 10
Gallery Image 1
Gallery Image 2
Gallery Image 3
Gallery Image 4
Gallery Image 5
Gallery Image 6
Gallery Image 7
Gallery Image 8
Gallery Image 9
Gallery Image 10

Order a Sample Door​​ below!

Up to two (2) sample doors fully refundable with each full kitchen purchase, use coupon code freesample at checkout.

icon5
Construction
Solid Wood Face Frame with Plywood Sides
icon4
Shipping
Most Cabinets Ship in 1 week
icon3
Hinges
Full Overlay Concealed Soft Close
icon2
Drawer Boxes & Slides
Full Extension Dovetail Drawer Boxes with Soft Close Runners
icon1
Color and Finish
Smoky Gray, Soda, Sterling
icon1
Interior Finish
Natural Birch Interiors
spray_can_icon
End Panels
Finished to Match Cabinets

Cabinet Assembly Videos

Wall Cabinet Assembly Video

Base Cabinet Assembly Video

Diagonal Wall Cabinet Assembly Video

Lazy Susan Cabinet Assembly Video

Double Oven Assembly Video

Tall Pantry Cabinet Assembly Video

No 2 kitchens are the same, so how do you know what cabinets fit best into your budget. So we took a random kitchen and priced out what the starting price would be for each collection. This is only so you can get an idea of what is the price difference between each collection. This doesn’t include moldings, toe kicks, or an decorative items.

Below is a list of cabinets that we figured for a 10×10 kitchen so you get an idea of price difference between collections.

10×10 Cabinet List:

  • BBC42 – 42″ Blind Base Cabinet
  • SB36 – 36″ Sink Base Cabinet
  • B09 – 09″ Base Cabinet
  • B30 – 30″ Base Cabinet
  • W0930 – 09″W x 30″H Wall Cabinet
  • W1530 – 15″W x 30″H Wall Cabinet
  • W3030 (x2) – 30″W x 30″H Wall Cabinet
  • W3012 – 30″W x 12″H Wall Cabinet
  • W3612 – 36″W x 12″ H Wall Cabinet
  • BF3 – 3″ Base Filler
  • WF3 (x2) – 3″W x 30″H Wall Filler
  • DWP – Dishwasher Panel With 3″ Return

Choose Color

Type

Filter

JAR - Double Trash Pullout (only)
Starts at $97.91
JAR - Single Trash Pullout (only)
Starts at $91.45
JAR Transitional - 1/4
Starts at $101.52
JAR Transitional - 2 Drawer Base Cabinet
Starts at $415.44
JAR Transitional - 3 Drawer Base Cabinet
Starts at $262.08
JAR Transitional - 3/4
Starts at $120.96
JAR Transitional - Arched Valance
Starts at $36.00
JAR Transitional - Base 2 Doors W/1 Drawer & Butt Doors
Starts at $271.44
JAR Transitional - Base 2 Doors W/2 Drawers & Butt Doors
Starts at $380.88
JAR Transitional - Base 2 Doors W/2 Drawers & Butt Doors
Starts at $136.08
JAR Transitional - Base Decorative End Panel
Starts at $100.08
JAR Transitional - Base Diagonal Corner Sink W/1 False Drawer and 1 Door
Starts at $596.88
JAR Transitional - Base End Cabinet
Starts at $349.92
JAR Transitional - Base End Shelf
Starts at $223.20
JAR Transitional - Base Fillers
Starts at $24.48
JAR Transitional - Base Molding
Starts at $84.24
JAR Transitional - Batten Molding
Starts at $17.28
JAR Transitional - Blind Base Cabinet
Starts at $375.84
JAR Transitional - Corbel JAR
Starts at $109.44
JAR Transitional - Crown Molding
Starts at $73.44
JAR Transitional - Desk Drawer (Makeup Drawer)
Starts at $152.64
JAR Transitional - Dishwasher End Panel
Starts at $55.44
JAR Transitional - Easy Reach Cabinet (fixed shelf only)
Starts at $467.28
JAR Transitional - Farm Sink Base W/Butt Doors
Starts at $371.52
JAR Transitional - Inside Corner Molding
Starts at $20.88
JAR Transitional - Light Rail
Starts at $56.88
JAR Transitional - Microwave Base
Starts at $223.20
JAR Transitional - No Mullion Style Textured Glass Butt Doors
Starts at $85.68
JAR Transitional - No Mullion Style Textured Glass Single Door
Starts at $43.92
JAR Transitional - Outside Corner Molding
Starts at $20.88
JAR Transitional - Quarter Round Molding
Starts at $30.24
JAR Transitional - Scribe Molding
Starts at $17.28
JAR Transitional - Shaker Beveled Edge Molding
Starts at $56.88
JAR Transitional - Shaker Insert Molding
Starts at $16.56
JAR Transitional - Shaker Raised Panel Door Valance
Starts at $120.96
JAR Transitional - Shaker Valance
Starts at $30.96
JAR Transitional - Single Bead Insert Molding
Starts at $12.05
JAR Transitional - Sink Base Cabinet W/1 False Drawer & Butt Doors
Starts at $271.44
JAR Transitional - Sink Base Cabinet W/2 False Drawers & Butt Doors
Starts at $360.72
JAR Transitional - Soft Close Rollout Trays
Starts at $57.60
JAR Transitional - Tall 2 Door Pantry
Starts at $614.88
JAR Transitional - Tall 4 Doors Pantry W/ Butt Doors
Starts at $658.80
JAR Transitional - Tall Fillers
Starts at $56.88
JAR Transitional - Tall Oven W/ Butt Doors & 3 Drawers
Starts at $825.12
JAR Transitional - Toe Kick Molding
Starts at $18.72
JAR Transitional - Touch Up Kit
Starts at $38.16
JAR Transitional - Turnpost JAR
Starts at $132.48
JAR Transitional - Vanity 3 Drawer Base
Starts at $255.60
JAR Transitional - Vanity Sink Base W/1 False Drawer & Butt Doors
Starts at $241.20
JAR Transitional - Vanity Sink Bases W/2 Drawers on Left and 1 Door
Starts at $377.28